| Designator | SBT10c |
| Material | Thrie-Beam (T) |
| Test Specification | NCHRP Report 350 |
| Test Level | TL-3 |
| Perm/Temp | Permanent |
| Mounting Type | Deck |
| Deck Type | Conventional Reinforced Concrete |
| Aesthetic | No |
| See-Through | Yes |
| Retrofit | No |
| Combo Traffic/Pedestrian | No |
| Contact | Federal Highway Administration |
| Drawing Status | No Drawing |
| Manufacturer | Non-Proprietary |
| FHWA Eligibility Letter | |
| Components | |
| Drawings | ne_tthrie_plan.tif ne_tthrieplan.tif |
| Other Docs | ne_tthriep1.pdf ne_tthriep2.pdf |
| Archive | |
| External Links |
NE Tubular Thrie Beam
|
0