Designator | STG02 |
Type | Guardrail-to-Guardrail (G) |
System 1 | MGS W-Beam Guardrail |
System 2 | Thrie-Beam Guardrail |
Test Specification | NCHRP Report 350 |
Test Level | TL-3 |
Drawing Status | As Submitted |
Perm/Temp | Permanent |
Contact | Midwest Roadside Safety Facility |
Manufacturer | Non-Proprietary |
FHWA Eligibility Letter | b187.pdf |
Components | 4-Space W-Beam Guardrail 1- & 2-Space Thrie-Beam Guardrail MGS Timber Blockout for Steel Guardrail Post Guardrail Bolt & Recessed Nut Guardrail Bolt & Recessed Nut Wide-Flange Guardrail Post Asymmetrical W-Thrie Beam Transition Section Thrie-Beam Timber Blockout for Steel Posts Wide-Flange Guardrail Post |
Drawings | MWT-5 R8.dwg STG02_Draft20140707.pdf midsection_w-thrie.DWG |
Other Docs | TRR 2025 Paper 07-2628.pdf b187.pdf |
Archive | |
External Links |
MGS W-Beam to Thrie-Beam Transition
|
0