| Designator | SBB30b |
| Material | Steel Tube/Box (B) |
| Test Specification | NCHRP Report 350 |
| Test Level | TL-2 |
| Perm/Temp | Permanent |
| Mounting Type | Curb/Sidewalk |
| Deck Type | Conventional Reinforced Concrete |
| Aesthetic | No |
| See-Through | Yes |
| Retrofit | No |
| Combo Traffic/Pedestrian | No |
| Contact | Oregon Deptartment of Transportation |
| Drawing Status | No Drawing |
| Manufacturer | Non-Proprietary |
| FHWA Eligibility Letter | bridge.pdf |
| Components | |
| Drawings | or_2tube_plan.tif or_2tubeplan.tif |
| Other Docs | or_2tubep1.pdf or_2tubep2.pdf |
| Archive | |
| External Links |
OR Two Tube
|
0

