Skip to Main Content
Task Force 13
  • Organization
    • About TF13
    • TF13 Officers
    • Sub-Commitees
      • Subcommittee #1 – Publications Maintenance
      • Subcommittee #2 – Barrier Hardware
      • Subcommittee #3 – Bridge Railings & Transitions
      • Subcommittee #5 – Support Hardware
      • Subcommittee #6 – Work Zone Systems
      • Subcommittee #7 – Test Facilities
      • Subcommittee #9 – Marketing
      • Subcommittee #11 – Delineation
      • Subcommittee Archive
  • Hardware Guide
    • Hardware Guide Home
    • Bridge Railings
    • Crash Cushions
    • End Treatments / Terminals
    • Longitudinal Barriers
    • Sign Supports
    • Transition Systems
    • Work Zone Systems
    • Components
    • Industry Contacts / Manufacturers
    • Submission Guide
      • Drawing Templates
      • Drawing Standards
  • Resources
    • Industry Contacts / Manufacturers
    • Test Facilities
    • Resource Charts
  • News
    • Latest News
    • TF13 Meeting Notes
    • TF13 Newsletters
  • Contact
    • Contact TF13
    • Contact Guide Manager
    • LinkedIn
  • REGISTER
8 Sep 2022

Gregory Highway

by Information Analytics | | 0
Contact Name Jeff Grover
Email jgrover@gregorycorp.com
Address

4100 13th Street, SW Canton, OH 44710

Phone (330) 477-4800
Url https://www.gregorycorp.com/gregory-highway
Logo
End Treatments/Terminals
  • Safence Cable End Terminal
Longitudinal Barriers
  • Nature Rail Quick-Joint 2.0 Aesthetic Wood/Steel Guardrail
  • GMS Guardrail: 27" Median W-Beam, 150" Post Spacing
  • GMS Guardrail: 31" Median W-Beam, 150" Post Spacing
  • SAFENCE Cable Median Barrier
  • SAFENCE Cable Barrier in 4H:1V Sloped Medians
  • GMS GUARDRAIL: 39" MEDIAN THRIE-BEAM
  • GMS Guardrail: 27" Roadside W-Beam, 150" Post Spacing
  • GMS Guardrail: 27" Roadside W-Beam, 75" Post Spacing
  • GMS Guardrail: 27" Roadside W-Beam, 37-1/2" Post Spacing
  • GMS Guardrail: 27" Roadside W-Beam, 18-3/4" Post Spacing
  • GMS Guardrail: 31" Roadside W-Beam, 150" Post Spacing
  • GMS Guardrail: 31" Roadside W-Beam, 75" Post Spacing
  • GMS Guardrail: 31" Roadside W-Beam, 37-1/2" Post Spacing
  • GMS Guardrail: 31" Roadside W-Beam, 18-3/4" Post Spacing
  • GMS Guardrail: 39" Roadside Thrie-Beam
  • GMS Guardrail: 27" Median W-Beam, 75" Post Spacing
  • GMS Guardrail: 27" Median W-Beam, 37-1/2" Post Spacing
  • GMS Guardrail: 27" Median W-Beam, 18-3/4" Post Spacing
  • GMS Guardrail: 31" Median W-Beam, 75" Post Spacing
  • GMS Guardrail: 31" Median W-Beam, 37-1/2" Post Spacing
  • GMS Guardrail: 31" Median W-Beam, 18-3/4" Post Spacing
Work Zone Systems
  • TTMA-200 Trailer-Mounted Attenuator
Previous Post
Next Post

Hardware Categories

  • Bridge Railings
  • Crash Cushions
  • End Treatments/Terminals
  • Longitudinal Barriers
  • Sign Supports
  • Transition Systems
  • Work Zone Systems
  • Components
  • Industry Contacts/Manufacturers

Other Links

  • AASHTO TCRS
  • FHWA Roadway Departure
  • Midwest Roadside Safety Facility
  • Texas A&M Transportation Institute

Guide Archives

  • 1979 Barrier Hardware Guide [PDF, 77MB]
  • 1980 Lighting Pole Guide [PDF, 25MB]
  • 1999 Drainage Products Guide [PDF, 46MB]

© 2023 Task Force 13 - WordPress Theme by Kadence WP